Wednesday, September 19, 2012

Day 263

We're just about ready to open the latrines at the 6 schools in Musanze District. We visited two of the schools today, and are eager to open them for use.

Brad checks out the new privacy wall and new doors that were built in front of the existing latrines at one site. The contractor Mark, Agnes, and district representative, Valens look on.

The contractor shows Brad one of the 10,000 liter water tanks that collects the rainwater that runs off from the roof, through a gutter system, and into the tank. We have installed two such systems at the majority of the schools.

No comments: